Skip Ribbon Commands
Skip to main content

News

News
24/05/2014
More than 15.6 trillion VND will be invested to build a tunnel route under Ca Pass and Co Ma Pass, linking the two central provinces of Phu Yen and Khanh Hoa on the National Highway 1A.  

 

 


The tunnel route will be 13.4 km long, with the section under Ca Pass measuring 3.9 km and 500m under the Co Ma pass.

Construction is scheduled to start on November 18 and complete by 2016.

On completion, the tunnel route is expected to reduce traffic accidents on National Highway 1A and contribute to the development of big economic centres, industrial zones and tourism sites in the central region.

It will also attribute to socio-economic and political development and ensure security-defence in the central and Central Highlands region

VNA

 
 
Manage PermissionsManage Permissions
|
Version HistoryVersion History

Tiêu đề

Hình ảnh

Hình ảnh mô tả

Tóm tắt

Nội dung

Link thay thế nội dung

Ngày xuất bản

Tin nổi bật

Tác giả

Phân loại

Loại bài viết

Phạm vi

Số Trang

Số Ảnh

Trạng thái

Lịch sử

Số lượt người đọc

Attachments

Content Type: Tin Tức Mở Rộng
Version:
Created at by
Last modified at by
©2014 Civil Engineering Construction Corporation No. 4 Ltd
Design and development: LacViet Computing Corporation